In case you missed it,
here is the first installment about the basement remodel.
When I last left the story of the basement remodel, Drew had framed the basement and we were shopping at Menards. We're still shopping at Menards, by the way. I also forgot to mention that, in addition to putting in the egress window, Drew replaced all of the other windows in the basement. They were originals and quite drafty and the new windows are very nice! He also rebuilt the stairs. Yes,
rebuilt. He and his dad tore them out one day and replaced them because they were serviceable, but not done well. That's just how we roll here, we rebuild stairs.
 |
| The rebuilt stairs. They are much sturdier than the old ones and we can put a stair skirt on them when we finish. |
Once the framing was in place, we set about getting the duct work in place. When the basement
bathroom was being remodeled, I had some HVAC guys come out to add a vent to the bathroom. The bathroom didn't have a finished ceiling and the previous owners had just tapped into a line that went out to the addition. Since we were finishing the ceiling and adding an overhead light and fan unit, the vent needed to be moved to the wall. That bathroom vent was the only air source in the entire basement and we had one return unit near the base of the furnace. Not so efficient or comfortable, right? So the HVAC guys came out again and redid our entire house duct work. It was a large project.
 |
| New HVAC duct work. |
Previously, all of the registers upstairs were on the interior walls and there was one return basically above the furnace in the kitchen. Drew had them switch the return and supply lines and he cut holes in our wood floors for the new supply lines. All of the new supply registers are under the windows to more effectively heat and cool the house. We noticed a big difference in the continuity of the temperature throughout the house. It's great!
After the duct work was completed, Drew and my dad started in on the wiring. They spent quite a bit of time fixing some of the old stuff as half of the house ended up being wired to one breaker. They were really cute together; I'd come down to offer a snack and a beverage and they'd be sort of staring at something, arms folded across their chests. One of them would say something, they'd shift their weight, the other one would say something, maybe crouch down, and then there'd be more silence. They wired the can lights for the living room, lights for the closest, and all sorts of outlets. I'm fairly certain they increased the number of breakers in the electrical box by at least 50%. They didn't start any fires and no one got zapped. Success.
Once everything was wired up, Drew and I stuffed insulation between the studs around the exterior walls. We're hoping that will make the space down there much more comfortable.
 |
| Insulation added in the walls. |
Next Drew calculated how much sheetrock he'd need and we, once again, made the trip to Menards. He and Larry hung the rock over the course of 2 days. They pretty much rocked the rock... (thanks, folks, I'll be here all week!) This event marked the start of the appearance of a fine, white dust that permeated all areas of the house. I'm still trying to get rid of it all.
 |
| Drywall. Necessary, but so messy. |
After the rock was up, we contracted someone to take care of the mudding. Yes, we paid someone to do some of the work on the basement. I mudded the basement bathroom and vowed never again. Drew was already quite knowledgeable on the joys of mudding so I didn't have to work too hard to get him to agree with hiring a contractor for that task. The guys came in and knocked it out in about 3 days and it looks way better than anything I could have ever done down there. The rounded corners on our soffits look amazing.
 |
| Mudded drywall. |
That's it for this post. More to come soon!